Project Title | Contractor | Year | Location | Description |
---|---|---|---|---|
ROAD AKTIO – AMBRAKIA | METKA S.A | 2024 | VONITSA | Application of an antigraffiti painting system on walls with total surface area of 5,000m2 |
PIRAEUS TOWER | TERNA S.A | 2022 | PIRAEUS | The project as a whole concerns the completion and operation of the Piraeus Merchant and Shipping Center, known as Piraeus Tower, with 22 floors while the height of the building is 88 meters. Piraeus Tower planned utilization of offices, restaurants and underground parking. Below are our contracting works:
|
DESFA | EDIL | 2019 | REVITHOUSA | Painting of firefighting pipes and metal structures in Tank A and Tank B |
GOLDEN UNION | REDEX | 2019 | LYKOVRISI | Luxury paint in a central circular staircase from a concrete surface |
NEW BUILDING VIOPOL | VIOPOL | 2019 | SXIMATARI VIOTIAS | Application of Passive Fire Protection System in ΕΝ13381-8 to steel construction |
GREECE AIRPORTS | INTRAKAT | 2018 | AKTIO - THESSALONIKI - ZAKYNTHOS - KEFALONIA | AKTION AIRPORT
|
THE ORBIT | TERNA | 2018 | ATHENS | Application of Passive Fire Protection System R60min in ΕΝ13381-8. Application of Anticorrosion Protection System C3/Medium Application of Epoxy Paint System Re-painting of existing external metal staircases
Leed certification requirements |
Piraeus Port Plaza | Core Construction | 2017 | Piraeus | Exterior paint on surfaces of existing trapezoidal sheet metal.
Paint existing gutters.
|
The New Bioclimatic Office Building | Core Construction | 2017 | Neratziotissa | Painting interior and exterior constructions. |
New Super Store Plaisio | Core Construction S.A | 2017 | Agia Paraskevi | Application of Passive Fire Protection System R90min in ΕΝ13381-8 and final topcoat. |
Cosmote TV Studios and Offices Spaces | Dimand | 2017 | Kifissia | Application of Passive Fire Protection System R60min in ΕΝ13381-8 in C4/High enviroment category. Application of Anticorrosion Protection System C3/Medium. |
Multi-level building, Aggelikousis shipping group | INTRAKAT | 2017 | Kallithea | Luxury paint on columns of concrete, with excellent aesthetic architectural effect of the final coating. |
New Building Blum Hellas | K.LIAROMATIS S.A | 2016 | MARKOPOULO | Application of Passive Fire Protection System R30min in ΕΝ13381-8 and final topcoat in Offices building. Application of Passive Fire Protection System R60min in ΕΝ13381-8 and final topcoat in Warehouse building. |
The Mall Athens Loading Dock | LAMDA OLYMPIA VILLAGE | 2016 | MAROUSI | Removal of old paint system. Application of certified Passive Fire Protection System R60min in ΕΝ13381-8 and final topcoat. |
Kotronis Plastics | K.LIAROMATIS S.A | 2015 | Nafpaktos | Application of Passive Fire Protection System R90min in ΕΝ13381-8 and final topcoat |
Lidl Hellas | INTRAKAT | 2015 | Markopoulos | Application of Passive Fire Protection System R30min in ΕΝ13381-8 and final topcoat |
New Patras Port | K. LIAROMATIS S.A | 2014 | PATRA | Application of Passive Fire Protection System R60min and final topcoat. |
Neuropublic Seven-storey Metal Building | K.LIAROMATIS S.A & NEUROPUBLIC S.A | 2014 | Piraeus | Application of Passive Fire Protection System R90min in ΕΝ13381-8 and final topcoat. Paint System pattern sheets (Symdeck). |
Stavros Niarchos Foundation Cultural Center | LIAROMATIS S.A & J/V IMPREGILO SPA – TERNA S.A | 2014 | Palaio Faliro |
|
The Mall Athens Former H&M | LAMDA OLYMPIA VILLAGE S.A | 2013 | Marousi | Application of Passive Fire Protection System R60min and final topcoat. |
Fulgor Metal Building | EMEK S.A | 2013 | Korinthos | Application of Passive Fire Protection System R60min in EN13381 and final topcoat. |
My Market | K. KOULOURAS & SIA O.E | 2012 | Kapandriti | Application of Passive Fire Protection System R60min and final topcoat. |
CASH & CARRY | KON. KOULOURAS & SIA E.E | 2012 | Kilkis | Application of Passive Fire Protection System R30min and final topcoat. |
Tsivolas Recycle | I. LIAPIS GP | 2012 | Koropi | Application of Passive Fire Protection System R60min and final topcoat. |
Uni-Pharma | AKTOR ATE | 2012 | Kifisia | Application of Passive Fire Protection System R60min and final topcoat. |
Elval | K. LIAROMATIS S.A | 2012 | Inofyta Voiotias | Application of Passive Fire Protection System R60min and final topcoat |
Omikron Production | GM STEEL EPE | 2011 | Marousi | Application of Passive Fire Protection System R60min and final topcoat. |
METRO CASH & CARRY | ARIS HILAKOS & SIA E.E | 2010 | Sparti | Application of Passive Fire Protection System R60min and final topcoat. |
Business Center | AFOI MEGAGIANNI O.E | 2010 | Pikermi Attikis | Application of Passive Fire Protection System R30min and final topcoat. |
Mall Center Athenian Capitol | SOFMAN S.A | 2010 | Athens | Application of Passive Fire Protection System R60min and final topcoat. |
Ikea / Leroy Merlin | TERNA S.A. | 2010 | Ioannina | Application of Passive Fire Protection System R60min and final topcoat. |
Supermarket Building ALDI | ΑΚΤΩΡ ΑΤΕ | 2009 | Likovrisi Attikis | Application of Passive Fire Protection System R30min and final topcoat. |
Supermarket Building ALDI | ALPINE BAU GMBH | 2009 | Agrinio | Application of Passive Fire Protection System R30min and final topcoat. |
ΜΕΤΡΟ SUPER MARKET | CONSTEEL S.A | 2009 | Kalamata | Application of Passive Fire Protection System R60min and final topcoat. |
New Building Alkon Konstantopoulos L.T.D | SOFMAN S.A. | 2009 | Industrial Area Kerateas | Application of Passive Fire Protection System R45min and final topcoat. |
Headquarters of Ellaktor | AKTOR | 2009 | Kifissia | Removal of old paint system. Application of Anticorrosion Protection System on metal surface. |
Andrikopoulos Delivery Center AEBE | X. XRISTOPOULOS SA | 2009 | Omvria Messatidos | Application of Passive Fire Protection System R60min and final topcoat |
Storage and repackaging Handling Hellas S.A. | CONSTEEL S.A. | 2009 | INDUSTRIAL AREA AVLONA | Application of Passive Fire Protection System R90min and final topcoat. |
Metal Bridge | ALLISOS S.A - WOG AG | 2009 | Node Kifissos Avenue and National Road Athens-Lamia | Removal of old paint system. Application of Anticorrosion Protection System on metal surface. |
Motor Oil | SOFMAN S.A. | 2009 | Saints Theodoroi | Application of Anticorrosion Protection System on steel sections to used pipe refinery rack. |
Aldi | Construction Companies | 2009 | Contractor: ALPINE BAU GMBH Location: AGRINIO Description: Application of Passive Fire Protection System R30min and final topcoat.
Contractor: AKTOR ATE Location: LIKOVRISI ATTIKIS Description: Application of Passive Fire Protection System R30min and final topcoat.
Contractor: K.LIAROMATIS SA. Location: PATRAS INDUSTRIAL AREA Description: Application of Passive Fire Protection System R30min, R60min, R90min and final topcoat
|
|
ΜΕΤΡΟ SUPER MARKET | AKTOR A.T.E | 2008 | Elefsis | Application of Passive Fire Protection System R60min and final topcoat |
Commercial Warehouse with offices | PE.LA DOMIKH L.T.D | 2008 | Aspropirgos Attikis | Application of Passive Fire Protection System R60min and final topcoat. |
Recording Cultural Heritage of Municipalities Association Members | EVDROMOS A.T.E | 2008 | Galatsi | Application of Passive Fire Protection System R30min and final topcoat. |
New Building Loy System | SOFMAN S.A | 2008 | Glyfada | Application of Passive Fire Protection System R90min and final topcoat. |
Cultural Centre asvestokaminos | EYDROMOS S.A | 2008 | Galatsi | Application of Passive Fire Protection System R30min and final topcoat. |
Building Eurobank Leasing | ARCON CONSTRUCTION S.A | 2008 | Marousi | Application of Passive Fire Protection System R60min, R90min and final topcoat. |
Unιmac | AKTOR S.A | 2008 | Koropi | Application of Passive Fire Protection System R60min and final topcoat. |
ΑΒ Basilopoulos | ARXIKON S.A | 2008 | Inofyta Voiotias | Application of Passive Fire Protection System R45min, R90min and final topcoat. |
Metal Tower In KERAKOLL | TECHNIKI ANODOS S.A | 2008 | Sximatari | Application of Passive Fire Protection System R60min and final topcoat. |
Εlbisco | AXILLEUS TECHNIKH S.A | 2008 | Pikermi | Application of Passive Fire Protection System R60min and final topcoat. |
Building VIVECHROM | K. LIAROMATIS S.A | 2008 | Aspropyrgos | Application of Passive Fire Protection System R60min and final topcoat. |
Distribution Center (Logistics) Furniture SATO | AKTOR S.A | 2008 | Mandra Attiki | Application of Passive Fire Protection System R60min and final topcoat. |
Commercial Warehouse BIC | TECHNIKI ANODOS A.T.E | 2008 | Saint Stephan | Application of Passive Fire Protection System R60min and final topcoat. |
Ikea | AKTOR S.A | 2008 | Larisa | Application of Passive Fire Protection System R60min and final topcoat. |
Ikea | H.M. Housemarket (Cyprus) LTD | 2008 | Lefkosia Cyprus | Application of Passive Fire Protection System R90min and final topcoat |
Mastic Factory | P & G Development S.A | 2007 | Chios | Application of Passive Fire Protection System R60min and final topcoat. |
Ikea | AKTOR S.A | 2007 | Egaleo | Application of Passive Fire Protection System R45min and final topcoat. |
Warehouses ELTREKKA- TECHNOKAR | XIDAS CONSTRUCTION | 2007 | Elefsina | Application of Passive Fire Protection System R60min and final topcoat.. |
Fotomatic | EMVATIS S.Α | 2007 | Patisia | Application of Passive Fire Protection System R60min and final topcoat. |
Metro Cash & Carry | D.S. STEEL S.A | 2006 | Mandra Attikis | Application of Passive Fire Protection System R60min and final topcoat. |
Metro Cash & Carry | D.S. STEEL S.A | 2006 | Ksanthi | Application of Passive Fire Protection System R60min and final topcoat.ς. |
Carrefour | D.S. STEEL S.A | 2006 | Patra | Application of Passive Fire Protection System R60min and final topcoat. |
MEGA Kotsovolos | VENCON VARSOS S.Α | 2006 | Petrou Ralli | Application of Passive Fire Protection System R60min and final topcoat. |
Airport Extension | SILKAMET S.A | 2006 | Rodos | Application of Passive Fire Protection System R60min and final topcoat. |
Greek Recycle Centre | ZITA TECHNIKI L.T.D | 2005 | Saints Theodoroi | Application of Passive Fire Protection System R60min and final topcoat. |
The Mall Athens | J. & P. AVAX | 2005 | Marousi | Application of Passive Fire Protection System R60min and final topcoat. |
Chemix S.A | D.S. STEEL S.A | 2005 | Pallini | Application of Passive Fire Protection System R60min and final topcoat |
Olympic Wrestling Hall | J. & P. AVAX | 2004 | Ilion | Application of Passive Fire Protection System R60min and final topcoat |
Olympic Boxing Hall | Kataskevastiki J. Dimitriou L.T.D. | 2004 | Peristeri | Application of Anticorrosion Protection System and Passive Fire Protection System R60min. |
Swimming Pools Olympic Stadium | Kataskevastiki J. Dimitriou Ltd | 2004 | Marousi | Application of Anticorrosion Protection System in additional tiers and walk wales |
Metal Tower Exercises in O.L.P | EX. EL. MAK. METAL. | 2004 | Piraeus | Application of Anticorrosion Protection System |
Suburban Railway Station | D.S. STEEL S.A | 2004 | Koropi, Kantza, Pallini, N. Irakleio | Application of Anticorrosion Protection System |
New Stadium Karaiskaki | Kataskevastiki J. Dimitriou L.T.D. | 2004 | New Faliro | Application of Anticorrosion Protection System on Steel Staircases. |
Sports Federation SEGA | - | 2003 | Athens | Application of general paints in the Main Building.
|
New Hippodrome of Athens | INTRAMET | 2003 | Athens | Application of Epoxy Paint System. |
Suburban Railway Station | DS STEEL SA | Year: 2006 Application of Alkyd Paint System at Station Pentelis Avenue.
Year: 2005 Application of Alkyd Paint System at Stations Koropi – Kantza – Pallini – N.Iraklio. |
||
Carrefour | Construction Companies | Contractor: D.S STEEL S.A Year: 2006 Location: Patra Description: Application of Passive Fire Protection System R60min and final topcoat.
Contractor: J&P AVAX Year: 2005 Location: Messini Description: Application of Passive Fire Protection System R60min and final topcoat.
|
||
Jumbo | Construction Companies | Contractor: IONIKI ATEKE Year: 2010 Location: PREVEZA Description: Application of Passive Fire Protection System R60min and final topcoat.
Contractor: Κ.Ι. PRIOVOLOS Α.Ε.Β.Ε Year: 2010 Location: PREVEZA Description: Parking areas road marking
Contractor: PE.LA DOMIKI E.P.E Year: 2008 Location: OINOFYTA Description: Application of Passive Fire Protection System R60min and final topcoat.
|
||
Unilever | Construction Companies | Contractor: AKTOR S.A Year: 2011 Location: Sximatari Description: Application of Passive Fire Protection System R30min, R45min, R60min and final topcoat
Contractor: CONSTEEL S.A Year: 2010 Location: AGIOS IOANNIS RENTIS Description:
Contractor: J.&P. AVAX Year: 2007 Location: Marousi Description: Industrial floor |
||
Cash & Carry – My Market | Construction Companies | ΜΥ ΜΑΡΚΕΤ Contractor: Κ. KOULOURAS & SIA O.Ε Year: 2012 Location: Kapandriti Description: Application of Passive Fire Protection System R60min and final topcoat.
CASH & CARRY Contractor: ΚON. KOULOURAS & SIA E.E Year: 2012 Location: Kilkis Description: Application of Passive Fire Protection System R60min and final topcoat.
CASH & CARRY Contractor: ΚON. KOULOURAS & SIA E.E Year: 2012 Location: Giannitsa Description: Application of Passive Fire Protection System R60min and final topcoat.
CASH & CARRY Contractor: ARIS CHEILAKOS & SIA O.E Year: 2010 Location: Sparti Description: Application of Passive Fire Protection System R60min and final topcoat.
CASH & CARRY Contractor: CONSTEEL S.A Year: 2009 Location: Kalamata Description: Application of Passive Fire Protection System R60min and final topcoat.
CASH & CARRY Contractor: DS STEEL S.A Year: 2006 Location: Mandra Attikis Description: Εφαρμογή Συστήματος Παθητικής Πυροπροστασίας R60min και τελικής επίστρωσης.
CASH & CARRY Contractor: DS STEEL S.A Year: 2006 Location: Ksanthi Description: Application of Passive Fire Protection System R60min and final topcoat. |